Cairo Metro Line 1: public address
Passenger announcements across 35 stations, run from one control point.

Project Overview
ACTEL installed the public address system in 35 stations on Cairo Metro Line 1, operated centrally from the central control point.
ACTEL Scope
- Installation in 35 Line 1 stations
- Centralized operation from the central control point
Systems & Technologies
- TOA public address equipment
- Central control point
Project video
Project Activities


Related Projects
Transportation & Mobility
ENR National Microwave Modernization
Replacing the railway's nationwide microwave network, with transmission, management, power and monitoring.
Transportation & Mobility
Nagah Hammadi – Luxor corridor
Operational communications for 118 km of modernized railway signalling.
Transportation & Mobility
Zagazig – Ismailia railway
Wireless dispatch and a renewed SDH fiber optic network.
Have a project that cannot afford communication failure?
Talk to ACTEL’s engineering team about the architecture, integration and ongoing support your operation requires.
